Trending Now

The Ultimate 2024 On-Page SEO Checklist: 100+ Points to Boost Your Website's Rankings
Beyond the Paycheck: The Rise of Worker-Centric Cultures in Global Industries
What is the primary measurement during Inspect and Adapt?
Which statement is true about refactoring code?
A team integrates and tests the Stories on the last day of the Iteration. This has become a pattern for the last three Iterations.
What is the purpose of the fishbone diagram?
Which two events provide opportunities for the team to collaborate? (Choose two.)
Why are phase-gate Milestones problematic?
What is one outcome of an integration point?
How is average lead time measured in a Kanban system?
During Iteration planning, the Product Owner introduces multiple new Stories to the team.
An Agile Team decides they want to use pair programming in future Iterations. Where should this be captured?
What is a benefit of an Agile Release Train that has both cadence and synchronization?
Three teams are working on the same Feature. Team A is a complicated subsystem team, and Teams B and C are stream-aligned teams.
What is one way a Scrum Master leads the team's efforts for relentless improvement?
What is the purpose of the retrospective held during an Inspect and Adapt event?
What is one problem with phase-gate Milestones?
What should be the first step a team should take to feed potential problems into the Problem-Solving workshop?
What is the output of an Inspect and Adapt event?
Lee is a developer on the team. At every daily stand-up Lee reports, "Yesterday, I worked on indexing. Today, I will work on indexing. No impediments."
How is team performance calculated in SAFe?
What is the purpose of the scrum of scrums meeting during PI Planning?
Navigating Project Complexity: Strategies from the PMBOK 7th Edition
How ITIL 4 Enhances Digital Transformation Strategies: The Key to Modernizing IT Infrastructure
Which statement is true about batch size, lead time, and utilization?
When is collaboration with System Architects and the Systems Team likely to have the greatest impact on Solution development?
Streamlining Vaccine Development during a Global Health Crisis – An Imaginary PRINCE2 Case Study
Which two timestamps are required at minimum to measure lead time by using a Team Kanban board? (Choose two.)
What are two ways to develop T-shaped skills? (Choose two.)
Top Governing Bodies Certifications for Change Management Training
Global Talent, Local Impact: Building Capabilities Across Borders
Introductory Guide to Agile Project Management
How to Start Lean Six Sigma Yellow Belt Certification Journey?
12 Project Management Principles for Project Success
A Beginner's Guide to Site Reliability Engineering
Agile vs. DevOps: Difference and Relation
What is Agile Testing for Projects? - Best Practices & Benefits
What is Agile: History, Definition, and Meaning
The Agile Way of Thinking with Examples
Product Owner Responsibilities and Roles
CSM vs. SSM: Which Scrum Master Certification is Better?
Agile Scrum Product Owner Roles & Responsibilities
Top 7 Project Management Certifications to Level Up Your IT Career
Guide to Scrum Master Career Path in 2024
Scrum Master Certification Exam Preparation Guide
Agile vs SAFe: Comparison Between Both
Agile Scrum Best Practices for Efficient Workflow
Advantages of Certified Scrum Master
How to Get CSPO Certification?
Top 7 Ethical Hacking Tools in 2024
Ethical Hackers Salary Worldwide 2024!
The Complete Ethical Hacking Guide 2024
SRE vs DevOps: Key Differences Between Them
Everything about CISSP Certification
How to Pass the CISSP Certification?
What is one way a Scrum Master can gain the confidence of a stakeholder?
The ART stakeholders are concerned. What should be done?
What does a Scrum Master support in order to help the team improve and take responsibility for their actions?
What are two characteristics of teams that fear conflict?
What goes into the Portfolio Backlog?
What are three opportunities for creating collaboration on a team? 
The purpose of Continuous Integration is to deliver what?
Which of the four SAFe Core Values is an enabler of trust?
What is one requirement for achieving Continuous Deployment?
When should centralized decision-making be used?
What is a Product Owner (PO) anti-pattern in Iteration planning?
How are the program risks, that have been identified during PI Planning, categorized?
The work within one state of a team's Kanban board is being completed at varying times, sometimes running faster and sometimes slower than the next state. What could resolve this issue?
What is a good source of guidance when creating an improvement roadmap that improves the teams technical practices?
A team consistently receives defect reports from production even though each Story is thoroughly tested. What is the first step to solve this problem?
What are two benefits of applying cadence? (Choose two.)
Which statement is true about work in process (WIP)?
What are relationships within a highly collaborative team based on?
A Scrum Master is frustrated that her team finds no value during Iteration retrospectives, and the team has asked that she cancel all future ones. Which two specific anti-patterns are most likely present within the team’s retrospectives? (Choose two.)
What are two purposes of the scrum of scrums meeting? (Choose two.)
What is the primary goal of decentralized decision-making?
How can a Scrum Master help the team remain focused on achieving their Iteration goals?
What are the benefits of organizing teams around Features?
If the distance between the arrival and departure curves on a team's cumulative flow diagram is growing apart, what is likely happening?
What is the purpose of the Large Solution Level in SAFe?
Why is the program predictability measure the primary Metric used during the quantitative measurement part of the Inspect and Adapt event?
Inspect and Adapt events occur at which two SAFe levels? (Choose Two)
Which two statements are true about a Feature? (Choose two.)
The Agile Team includes the Scrum Master and which other key role?
What are two actions the Scrum Master can take to help the team achieve the SAFe Core Value of transparency? (Choose two.)
Systems builders and Customers have a high level of responsibility and should take great care to ensure that any investment in new Solutions will deliver what benefit?
Which two Framework elements would a Scrum Master have the strongest connection and most frequent interaction? (Choose two.)
If a team insists that big Stories cannot be split into smaller ones, how would the Scrum Master coach them to do otherwise?
Why are Big Stories considered an anti-pattern?
CISA vs CISM: Which is better for a Cybersecurity Career?
Who is responsible for managing the Portfolio Kanban?
What is the goal of the House of Lean?
Social Media Marketing Strategies for Building Your Brand Presence Online
ITIL 4 Foundation Exam Tips and Study Guide
What is Site Reliability Engineering (SRE)?
How Toyota Entered the Luxury Car Market with Kaizen Principles
What are two ways to describe a cross-functional Agile Team? (Choose two.)
According to SAFe Principle #10, what should the Enterprise do when markets and customers demand change?
AWS Solution Architect Roles, Responsibilities and Salaries
Advantages of Attaining CISA Certification
Home
Which statement is true about ART events?

Which statement is true about ART events?

Picture of Bharath Kumar
Bharath Kumar
Bharath Kumar is a seasoned professional with 10 years' expertise in Quality Management, Project Management, and DevOps. He has a proven track record of driving excellence and efficiency through integrated strategies.

A. ART events run inside the team events, and the team events create a closed-loop system

B. The Inspect and Adapt is the only ART event required to create a closed-loop system

C. Team events run inside the ART events, and the ART events create a closed-loop system

D. The daily stand-up is an ART event that requires the scrum of scrums and Program Owner sync involvement in the closed-loop system

The Correct Answer is

C. Team events run inside the ART events, and the ART events create a closed-loop system.

Explanation

The statement that accurately reflects the relationship between Agile Release Train (ART) events and team events within the Scaled Agile Framework (SAFe) is:

  • Team events run inside the ART events, and the ART events create a closed-loop system.

This statement highlights the hierarchical nature of SAFe, where team-level events (such as daily stand-ups, iteration planning, iteration review, and iteration retrospectives) are nested within the larger framework of ART events. ART events, such as PI Planning, System Demos, and the Inspect and Adapt workshop, encompass multiple teams working together towards a common objective. These ART events ensure alignment, collaboration, and continuous improvement at a scale larger than individual teams, facilitating a cohesive and synchronized approach to delivering value.

Understanding the dynamics and interactions between team events and Agile Release Train (ART) events within the Scaled Agile Framework (SAFe) reveals the structured approach SAFe uses to scale Agile practices across larger organizations. The statement, “Team events run inside the ART events, and the ART events create a closed-loop system,” highlights the strategic alignment and synchronization necessary for managing complexity and delivering value at scale. Let’s dive into the details:

Agile Release Train (ART) Events

ART events are designed to bring teams together to align, plan, execute, and improve as a single entity or ‘train’. These events include:

  • PI Planning: A two-day event for all teams on the ART to align to a shared mission and vision. Teams plan their work for the next Program Increment (PI), discussing features, objectives, and dependencies.

  • ART Syncs: Regular synchronization meetings, such as the Scrum of Scrums and Product Owner Sync, facilitate cross-team coordination and address impediments that affect more than one team.

  • System Demos: Held at the end of each iteration, these demos showcase the integrated work from all teams on the ART, providing transparency and enabling feedback from stakeholders.

  • Inspect and Adapt (I&A): A significant ART event marking the end of each PI. It consists of a system demo reflecting the PI’s achievements and a problem-solving workshop to identify and address areas for improvement.

Team Events

Within each ART, individual teams operate in a series of Agile events that mirror those found in Scrum and Kanban methodologies, tailored to the context of SAFe:

  • Iteration Planning: Teams plan the work they will commit to completing during the iteration, breaking down features into user stories and tasks.

  • Daily Stand-up: A short, daily meeting where team members synchronize their work, discuss progress, and identify impediments.

  • Iteration Review: At the end of each iteration, teams demo their work to stakeholders, gathering feedback that may influence future iterations.

  • Iteration Retrospective: Teams reflect on their process, discussing what went well, and what didn’t, and how they can improve in the next iteration.

The Closed-Loop System

The interaction between ART and team events creates a closed-loop feedback system that promotes continuous delivery and improvement:

  • Alignment and Execution: PI Planning ensures that all teams are aligned with the ART’s objectives at the outset. Team events then drive the execution of these objectives, with ART Syncs ensuring ongoing alignment and coordination.

  • Feedback and Adaptation: System Demos and Iteration Reviews provide regular feedback loops, allowing teams and stakeholders to inspect progress. The Inspect and Adapt event closes the loop at the ART level, where strategic adjustments are made based on collective insights from the PI.

This hierarchical structuring—where team events operate within the broader context of ART events—enables SAFe to effectively manage the complexities of scaling Agile practices. It ensures that while teams maintain their agility and ability to adapt at a micro level, they are also synchronized and aligned towards the common goals of the ART, thus delivering value more efficiently at scale.

Other Leading SAFe 6.0 Question – What is one way Lean-Agile leaders lead by example?

Leave a Reply

Your email address will not be published. Required fields are marked *

Popular Courses

Follow us

2000

Likes

400

Followers

600

Followers

800

Followers

Subscribe us