ToggleValue stream mapping is based on Toyota’s material and information flow mapping method and traces the flow of materials and information across the production process. Since software also goes through stages, such as backlog, build, review, test, and release, software teams adapted this method as well. If you look at the map, you will see two important measurements:

Process time: The amount of time spent actively getting work done, such as coding and testing.
Wait time: The time spent waiting before the next step begins, for instance, the time taken to approve a pull request.
Wait time often accounts for a large share of total lead time. In many delivery processes, work spends more time waiting than being actively worked on. Flow efficiency is calculated as the ratio of process time to total lead time.
Steps for Mapping Your Value Stream

- Select a single product or service. Mapping too many items is akin to creating a wall poster that nobody wants to read.
- Follow the flow of work with the people doing the work. Developers, testers, and the ops team contribute their own part of the story.
- Document the process and wait time at each step. Use the best available data – such as workflow timestamps, ticket data, or informed estimates.
- Identify handoffs, waiting times, and rework loops. Each backward arrow is a signpost.
- Identify the longest waiting time or major bottleneck, address its root cause, and create a future-state map showing the improved flow.
Instances of VSM: Where Process Bottlenecks are Hidden

Bottleneck—believe it or not, that isn’t usually where people expect it to be. Some classic hiding places include:
- Code review lines stuck behind one busy, senior engineer
- Commonly accessed test environments that require prior booking, like meeting rooms
- Weekly approval boards for changes
- Deadlines for functionality that have turned completed projects into a backlog of unreleased work.
- Bugs discovered at the end of the process, requiring rework that can delay the release.
Value stream mapping examples

Example 1 (hypothetical scenario). A project that takes 20 days to release functionality to production is considered slow because the work is done by developers first, then by QA specialists. Through mapping, we see that the bottleneck is a four-day delay due to waiting for security confirmation.
Example 2. A release train travels every second Thursday. Completed code sits idle until the next release. The solution to this is smaller, more frequent releases instead of allowing completed work to accumulate.
Suggested methods:
Begin with a whiteboard or a Miro board. Then, add data from Jira, GitHub, or other sources.
How Do Metrics Illustrate Your Fixes Worked?
Combine the map figure with the five DORA software delivery metrics: change lead time, deployment frequency, failed deployment recovery time, change failure rate, and deployment rework rate. The map describes why the metrics look the way they are, while the metrics show whether your fixes improved delivery performance.
Quick Checklist for Value Stream Management
- One product or service selected
- Process and wait periods noted
- Largest wait circled and owned
- Owner identified for each improvement action
- Value stream map updated after improvements are implemented
FAQs
1. How long does a mapping workshop take to complete?
One value-stream-focused session typically takes 3-4 hours.
2. Who are the stakeholders present in the room?
All those involved in the work process from product to operations need to be present.
3. How frequently should one modify it?
It should be modified after every significant improvement and at least quarterly.
Visibility of the Invisible
Delivery issues are really difficult but become clear once you visualize them. As soon as waiting times are put on paper, the discussion around who is slow disappears, and the focus shifts to the system.
To learn and practice Spoclearn Value Stream Mapping Training. Your next release is hidden somewhere in your pipeline, so check it out right now!