Trending Now

Process Mining + Lean Six Sigma: The 2026 Playbook for Faster, Data-Driven DMAIC
CAPM vs PMP in 2026: Which Certification Should You Choose (and When)?
PRINCE2 7 Certification Path: Foundation → Practitioner → Next Steps (2026 Roadmap)
Oracle Primavera P6 Training Roadmap (2026): From Beginner to Project Controls Expert
AI Overviews & AI Mode SEO: How to Win Visibility When Google Answers First
RCA vs 5 Whys vs Fishbone vs 8D vs A3: When to Use Which (Decision Framework)
PL-300 Case Study Walkthrough: From Raw Data to Executive Dashboard (End-to-End)
ITIL 4 vs ITIL (Version 5): The Global, No‑Fluff Guide to What’s New, What Stays, and How to Transition
PRINCE2 7 Foundation: Complete Exam Guide, Format, Pass Mark, and Study Plan (2026)
Lean Six Sigma Yellow Belt: The 2026 Beginner Guide (Tools, Examples, Real Workplace Use)
Technical SEO Audit 2026: The Only Checklist That Still Matters
Content Refresh Strategy 2026: How to Update Old Pages for New Traffic
CAPM Exam Content Outline Explained: Domains, Weightage, and What to Study First
GA4 Setup Guide 2026: Step-by-Step for Accurate Tracking
From Keywords to Answers: How Search Works in 2026 
CAPM Certification 2026: The Complete Exam + Training Guide (PMI-Updated)
Traditional SEO vs Answer-First SEO: What Actually Ranks in 2026
ITSM Evolution: From Monolithic Systems to Cloud‑Centric Architectures (2026)
How to Run High-Performance Retargeting Campaigns Using AI
Project Leadership in 2026: Skills Every Successful Project Manager Needs
Technical SEO for 2026: Crawl Optimization, Log Analysis & AI Indexing Signals
Top 12 Project Management Mistakes and How to Avoid Them
PRINCE2® 7 (2026 Guide): What’s New, What Changed, and Why It Matters
Lean Six Sigma in 2026: What’s Changed (AI, Automation, Process Intelligence) & What Still Works
Root Cause Analysis in 2026: The Modern RCA Playbook for Faster, Repeatable Fixes
ITIL Is for Everyone and for Every Organization: A Deep‑Dive Playbook (2026)
Social Media Algorithms Explained (2026 Edition): What Actually Drives Reach Today
Power Query Best Practices 2026: Faster Refresh, Cleaner Models, Fewer Errors
PL-300 Exam Guide 2026: Skills Measured, Study Plan, and What’s Changed
LLMS.txt vs Robots.txt in 2026: What to Implement (and What to Avoid)
SEO in 2026: The Complete Playbook for AI Search, AEO & GEO
Google Ads Audits in 2026: A Step-by-Step Checklist to Fix Wasted Spend and Unlock Growth
AI-Driven Risk Management: Predict Risks Before They Happen
On-Page SEO 2026: New Techniques for Topical Relevance & AI Search
The Future of Project Management: Trends Reshaping 2025–2030 
Hybrid Project Management: Why Organizations Are Transitioning in 2026 and Beyond
AI-Powered Project Planning: Faster, Smarter, and More Accurate Strategies 
Industry Predictions for 2026: From GenAI to Value Streams and Total Experience
PMP vs CAPM vs PRINCE2: Which Certification Offers the Best ROI in 2026?
AI in Project Management: How Intelligent Tools Are Transforming PM Workflows 
Performance Max Mastery: How to Scale ROI with Smart Automation 
What is SAFe RTE? (Release Train Engineer)
SAFe RTE: The Complete Guide to Becoming a High-Impact Release Train Engineer (2025–2026)
Time Management: How to Turn Hours into Impact
Lean Six Sigma Green Belt: Skills, Value, Demand & Global Trends 2026
PL-300: Microsoft Power BI Data Analyst Certification for Career Growth Globally 2026
Strong & Sustained Demand for PMP Certification in 2026
Why Organizational Agility Matters: The Strategic Imperative for Big Enterprises
Building an Agility Culture Beyond IT Teams
How to Re-Engage Remote Teams: PMP Question on Motivation and Collaboration
Understanding Tuckman’s Team Development Stages - PMP Exam Question Explained
Why do Business Owners assign business value to team PI Objectives?  
Benefits of EXIN Agile Scrum Foundation Certification
Benefits of PMP Certification for Corporate and Individual Professionals in 2025
Streamlining Vaccine Development during a Global Health Crisis – An Imaginary PRINCE2 Case Study
PMBOK Guide Tips for Managing Change and Uncertainty in Projects
How to Apply PRINCE2 Methodologies in Real-World Projects
What is PRINCE2® 7? A Simple Explanation for Beginners
Project Management Certification in the United States of America
The Evolution of Project Management: From Process-Based to Principles-Based Approaches
Mastering ITIL and PRINCE2 for Enhanced Project Outcomes in Indian GCCs
Exploring the Eight Project Performance Domains in the PMBOK® Guide
PMI Best Practices for Project Management Across Different Environments
Your Ultimate Project Management Guide: Explained in Detail
Top Benefits of PRINCE2 for Small and Medium Enterprises
Best Project Management Certifications of 2025
The Importance of Tailoring PRINCE2 to Fit Your Organization's Needs
Resolve Slash URLs & Learn 301 vs. 308 Redirects Effectively
What is a standard change in ITIL 4?
Which practice provides a single point of contact for users?
What is the first step of the guiding principle 'focus on value'?
Which is a benefit of using an IT service management tool to support incident management?
A service provider describes a package that includes a laptop with software, licenses, and support. What is this package an example of?
What should be included in every service level agreement?
What are the two types of cost that a service consumer should evaluate?
The Business Case for SAFe®: Solving Modern Challenges Effectively
Which ITIL concept describes governance?
How does ‘service request management’ contribute to the ‘obtain/build’ value chain activity?
Which practice is the responsibility of everyone in the organization?
How Kaizen Can Transform Your Life: Unlock Your Hidden Potential
Unlocking the Power of SAFe®: Achieving Business Agility in the Digital Age
What is DevOps? Breaking Down Its Core Concepts
Which is a purpose of the ‘service desk’ practice?
Identify the missing word(s) in the following sentence.
Which value chain activity includes negotiation of contracts and agreements with suppliers and partners?
How does categorization of incidents assist incident management?
What is the definition of warranty?
Identify the missing word in the following sentence.
Which two needs should ‘change control’ BALANCE?
Which value chain activity creates service components?
Kaizen Costing - Types, Objectives, Process
What Are ITIL Management Practices?
What are the Common Challenges in ITIL Implementation?
How Do You Align ITIL with Agile and DevOps Methodologies?
How Can ITIL Improve IT Service Management?
What is DevSecOps? A Complete Guide 2025
How to do Video Marketing for Audience Engagement?
What is Site Reliability Engineering (SRE)?
The History of DevOps: Tracing Its Origins and Growth
Mastering Business Agility: A Deep Dive into SAFe®
an-agile-team-decides-they-want-to-use-pair-programming-in-future-iterations

An Agile Team decides they want to use pair programming in future Iterations. Where should this be captured?

Picture of SPOCLEARN
SPOCLEARN
Upskill and Reskill in industry-recognized certification courses to become a Global Professional.

A. In the team retrospective notes

B. In the team’s improvement backlog

C. In the Inspect and Adapt meeting notes

D. In the Program Backlog

Correct Answer is

B. In the team’s improvement backlog

Explanation

The decision to use pair programming in future iterations should be captured in the team’s improvement backlog.

Here’s why this option is the most appropriate:

  • In the team retrospective notes: While the decision to adopt pair programming might be discussed and agreed upon during a retrospective, merely noting this decision in the retrospective notes might not ensure its implementation. Retrospective notes are important for capturing insights and decisions made during the meeting, but they are not always actionable or prioritized for future work.

  • In the team’s improvement backlog: This is the correct place to capture such a decision. The team’s improvement backlog is specifically designed to hold improvements, adjustments, and experiments the team plans to implement to enhance their processes and workflows. Capturing the decision to use pair programming here ensures that it is prioritized, tracked, and reviewed for effectiveness in future iterations. It makes the commitment more visible and actionable.

  • In the Inspect and Adapt meeting notes: The Inspect and Adapt (I&A) meeting is a SAFe event that occurs at the end of each Program Increment and involves the whole Agile Release Train. While it’s a venue for identifying larger-scale improvements, decisions about specific practices like pair programming, which are more tactical and team-specific, are best managed within the team’s domain, such as their improvement backlog.

  • In the Program Backlog: The Program Backlog is intended for features, enablers, and capabilities that require attention at the program level across multiple teams within the Agile Release Train. Decisions about specific engineering practices or process improvements within a single agile team, like adopting pair programming, do not typically belong in the Program Backlog. This backlog focuses on larger work items that impact the delivery of value at the program level.

By capturing the decision to use pair programming in the team’s improvement backlog, the team ensures that such process enhancements are considered, planned, and implemented systematically as part of their continuous improvement efforts.

Other SAFe Scrum Master Question – During Iteration planning, the Product Owner introduces multiple new Stories to the team. After a lot of discussion, the team decides to insert spikes into the Iteration for research. How should a Scrum Master help resolve this issue?

Leave a Reply

Your email address will not be published. Required fields are marked *

Subscribe us