Trending Now

What is one characteristic of an effective Agile Team?
Agile Scrum Foundation: Your First Step Towards Agile Mastery
If a team insists that big Stories cannot be split into smaller ones, how would the Scrum Master coach them to do otherwise?
According to SAFe Principle #10, what should the Enterprise do when markets and customers demand change?
If the distance between the arrival and departure curves on a team's cumulative flow diagram is growing apart, what is likely happening?
How does SAFe recommend using a second operating system to deliver value?
What is the purpose of the Large Solution Level in SAFe?
Why is it important to decouple deployment from release?
Why is the program predictability measure the primary Metric used during the quantitative measurement part of the Inspect and Adapt event?
How can trust be gained between the business and development?
Inspect and Adapt events occur at which two SAFe levels? (Choose Two)
What is the purpose of the retrospective held during an Inspect and Adapt event?
What should be the first step a team should take to feed potential problems into the Problem-Solving workshop?
What is the output of an Inspect and Adapt event?
Lee is a developer on the team. At every daily stand-up Lee reports, "Yesterday, I worked on indexing. Today, I will work on indexing. No impediments."
When is collaboration with System Architects and the Systems Team likely to have the greatest impact on Solution development?
How is team performance calculated in SAFe?
What is the purpose of the scrum of scrums meeting during PI Planning?
Which statement is true about batch size, lead time, and utilization?
During Iteration planning, the Product Owner introduces multiple new Stories to the team.
What is one outcome of an integration point?
What are two ways to develop T-shaped skills? (Choose two.)
What is one way a Scrum Master leads the team's efforts for relentless improvement?
An Agile Team decides they want to use pair programming in future Iterations. Where should this be captured?
What is the purpose of the fishbone diagram?
How is average lead time measured in a Kanban system?
What is one problem with phase-gate Milestones?
What is a benefit of an Agile Release Train that has both cadence and synchronization?
Three teams are working on the same Feature. Team A is a complicated subsystem team, and Teams B and C are stream-aligned teams.
ITIL 4 Foundation in Japan: Career Insights, Salary Trends, and Top Companies
The 7 QC Tools for Quality Management
Top Governing Bodies Certifications for Change Management Training
How are the Business Analysts Ruling The Healthcare Industry?
The Role of the ITIL 4 Service Value System in Modern ITSM
Comprehensive Guide to International SEO: Strategy, Implementation, and Best Practices
The Power of Header Tags in SEO - Best Practices and Real-World Impact
Optimizing URL Structures: Insights from My Journey in SEO
The Ultimate 2024 On-Page SEO Checklist: 100+ Points to Boost Your Website's Rankings
Understanding the Importance of Meta Descriptions
Embracing Change and Uncertainty in Projects: Insights from PMBOK's Latest Guide
Agile vs SAFe: Comparison Between Both
Continuous Integration & Continuous Deployment in Agile
Mastering Title Tags for SEO: A Deep Dive into Optimization Techniques
The 5 Pillars of Site Reliability Engineering
Future Of DevOps Engineering in 2024
Beyond the Paycheck: The Rise of Worker-Centric Cultures in Global Industries
What is the primary measurement during Inspect and Adapt?
Which statement is true about refactoring code?
A team integrates and tests the Stories on the last day of the Iteration. This has become a pattern for the last three Iterations.
Which two events provide opportunities for the team to collaborate? (Choose two.)
Why are phase-gate Milestones problematic?
Navigating Project Complexity: Strategies from the PMBOK 7th Edition
How ITIL 4 Enhances Digital Transformation Strategies: The Key to Modernizing IT Infrastructure
Streamlining Vaccine Development during a Global Health Crisis – An Imaginary PRINCE2 Case Study
Which two timestamps are required at minimum to measure lead time by using a Team Kanban board? (Choose two.)
Global Talent, Local Impact: Building Capabilities Across Borders
Introductory Guide to Agile Project Management
How to Start Lean Six Sigma Yellow Belt Certification Journey?
12 Project Management Principles for Project Success
A Beginner's Guide to Site Reliability Engineering
Agile vs. DevOps: Difference and Relation
What is Agile Testing for Projects? - Best Practices & Benefits
What is Agile: History, Definition, and Meaning
The Agile Way of Thinking with Examples
Product Owner Responsibilities and Roles
CSM vs. SSM: Which Scrum Master Certification is Better?
Agile Scrum Product Owner Roles & Responsibilities
Top 7 Project Management Certifications to Level Up Your IT Career
Guide to Scrum Master Career Path in 2024
Scrum Master Certification Exam Preparation Guide
Agile Scrum Best Practices for Efficient Workflow
Advantages of Certified Scrum Master
How to Get CSPO Certification?
Top 7 Ethical Hacking Tools in 2024
Ethical Hackers Salary Worldwide 2024!
The Complete Ethical Hacking Guide 2024
SRE vs DevOps: Key Differences Between Them
Everything about CISSP Certification
How to Pass the CISSP Certification?
What is one way a Scrum Master can gain the confidence of a stakeholder?
The ART stakeholders are concerned. What should be done?
What does a Scrum Master support in order to help the team improve and take responsibility for their actions?
What are two characteristics of teams that fear conflict?
What goes into the Portfolio Backlog?
What are three opportunities for creating collaboration on a team? 
The purpose of Continuous Integration is to deliver what?
Which of the four SAFe Core Values is an enabler of trust?
What is one requirement for achieving Continuous Deployment?
When should centralized decision-making be used?
What is a Product Owner (PO) anti-pattern in Iteration planning?
How are the program risks, that have been identified during PI Planning, categorized?
The work within one state of a team's Kanban board is being completed at varying times, sometimes running faster and sometimes slower than the next state. What could resolve this issue?
What is a good source of guidance when creating an improvement roadmap that improves the teams technical practices?
A team consistently receives defect reports from production even though each Story is thoroughly tested. What is the first step to solve this problem?
What are two benefits of applying cadence? (Choose two.)
Which statement is true about work in process (WIP)?
What are relationships within a highly collaborative team based on?
A Scrum Master is frustrated that her team finds no value during Iteration retrospectives, and the team has asked that she cancel all future ones. Which two specific anti-patterns are most likely present within the team’s retrospectives? (Choose two.)
What are two purposes of the scrum of scrums meeting? (Choose two.)
What is the primary goal of decentralized decision-making?
Home
how-is-team-performance-calculated-in-safe

How is team performance calculated in SAFe?

Picture of SPOCLEARN
SPOCLEARN
Upskill and Reskill in industry-recognized certification courses to become a Global Professional.

A. The ratio of tasks planned to tasks completed

B. Team member utilization as a percentage of total capacity

C. The ratio of Story points completed to Story points planned in the PI

D. The ratio of business value achieved to business value planned for the PI

The correct answer is

D. The ratio of business value achieved to business value planned for the PI

Explanation

In the context of the Scaled Agile Framework (SAFe), team performance is primarily measured by the ratio of Story points completed to Story points planned in the PI (Program Increment). This measurement reflects how effectively a team or Agile Release Train (ART) has delivered against its commitments throughout a PI.

Let’s briefly examine why this option is correct and why the others are less aligned with SAFe’s principles:

  • The ratio of tasks planned to tasks completed: While tracking tasks can offer insights into day-to-day productivity, SAFe emphasizes value delivery over task completion. The framework prefers more outcome-based measures, such as the delivery of Story points or business value, rather than the sheer number of tasks completed. This approach ensures that the focus remains on delivering value and outcomes that matter to customers and stakeholders.

  • Team member utilization as a percentage of total capacity: Utilization rates focus on how much of a team member’s time is being used for work, but high utilization doesn’t necessarily equate to effective or valuable output. SAFe encourages a sustainable pace and prioritizes delivering the most critical features and capabilities with the highest quality, rather than maximizing individual utilization.

  • The ratio of Story points completed to Story points planned in the PI: This is the correct measure within SAFe for evaluating team performance. It assesses the team’s ability to forecast and deliver work within a PI, focusing on the completion of work items estimated in Story points. This measure helps teams and stakeholders understand how effectively the team is delivering on its commitments and can guide continuous improvement.

  • The ratio of business value achieved to business value planned for the PI: While this is a valuable measure and SAFe certainly emphasizes the delivery of business value, the specific performance of teams is more commonly and directly assessed through Story points. Business value is often more subjective and can be influenced by factors outside the team’s control, making the direct ratio of Story points a more practical and frequently used metric for team performance within the framework.

Therefore, the ratio of Story points completed to Story points planned in the PI is the most accurate reflection of team performance in SAFe, focusing on the completion of work and value delivery over merely being busy or completing a high number of tasks.

Other SAFe Scrum Master Question – Lee is a developer on the team. At every daily stand-up Lee reports, “Yesterday, I worked on indexing. Today, I will work on indexing. No impediments.”

Leave a Reply

Your email address will not be published. Required fields are marked *

Popular Courses

Follow us

2000

Likes

400

Followers

600

Followers

800

Followers

Subscribe us