Trending Now

The Ultimate 2024 On-Page SEO Checklist: 100+ Points to Boost Your Website's Rankings
Beyond the Paycheck: The Rise of Worker-Centric Cultures in Global Industries
What is the primary measurement during Inspect and Adapt?
Which statement is true about refactoring code?
A team integrates and tests the Stories on the last day of the Iteration. This has become a pattern for the last three Iterations.
What is the purpose of the fishbone diagram?
Which two events provide opportunities for the team to collaborate? (Choose two.)
Why are phase-gate Milestones problematic?
What is one outcome of an integration point?
How is average lead time measured in a Kanban system?
During Iteration planning, the Product Owner introduces multiple new Stories to the team.
An Agile Team decides they want to use pair programming in future Iterations. Where should this be captured?
What is a benefit of an Agile Release Train that has both cadence and synchronization?
Three teams are working on the same Feature. Team A is a complicated subsystem team, and Teams B and C are stream-aligned teams.
What is one way a Scrum Master leads the team's efforts for relentless improvement?
What is the purpose of the retrospective held during an Inspect and Adapt event?
What is one problem with phase-gate Milestones?
What should be the first step a team should take to feed potential problems into the Problem-Solving workshop?
What is the output of an Inspect and Adapt event?
Lee is a developer on the team. At every daily stand-up Lee reports, "Yesterday, I worked on indexing. Today, I will work on indexing. No impediments."
How is team performance calculated in SAFe?
What is the purpose of the scrum of scrums meeting during PI Planning?
Navigating Project Complexity: Strategies from the PMBOK 7th Edition
How ITIL 4 Enhances Digital Transformation Strategies: The Key to Modernizing IT Infrastructure
Which statement is true about batch size, lead time, and utilization?
When is collaboration with System Architects and the Systems Team likely to have the greatest impact on Solution development?
Streamlining Vaccine Development during a Global Health Crisis – An Imaginary PRINCE2 Case Study
Which two timestamps are required at minimum to measure lead time by using a Team Kanban board? (Choose two.)
What are two ways to develop T-shaped skills? (Choose two.)
Top Governing Bodies Certifications for Change Management Training
Global Talent, Local Impact: Building Capabilities Across Borders
Introductory Guide to Agile Project Management
How to Start Lean Six Sigma Yellow Belt Certification Journey?
12 Project Management Principles for Project Success
A Beginner's Guide to Site Reliability Engineering
Agile vs. DevOps: Difference and Relation
What is Agile Testing for Projects? - Best Practices & Benefits
What is Agile: History, Definition, and Meaning
The Agile Way of Thinking with Examples
Product Owner Responsibilities and Roles
CSM vs. SSM: Which Scrum Master Certification is Better?
Agile Scrum Product Owner Roles & Responsibilities
Top 7 Project Management Certifications to Level Up Your IT Career
Guide to Scrum Master Career Path in 2024
Scrum Master Certification Exam Preparation Guide
Agile vs SAFe: Comparison Between Both
Agile Scrum Best Practices for Efficient Workflow
Advantages of Certified Scrum Master
How to Get CSPO Certification?
Top 7 Ethical Hacking Tools in 2024
Ethical Hackers Salary Worldwide 2024!
The Complete Ethical Hacking Guide 2024
SRE vs DevOps: Key Differences Between Them
Everything about CISSP Certification
How to Pass the CISSP Certification?
What is one way a Scrum Master can gain the confidence of a stakeholder?
The ART stakeholders are concerned. What should be done?
What does a Scrum Master support in order to help the team improve and take responsibility for their actions?
What are two characteristics of teams that fear conflict?
What goes into the Portfolio Backlog?
What are three opportunities for creating collaboration on a team? 
The purpose of Continuous Integration is to deliver what?
Which of the four SAFe Core Values is an enabler of trust?
What is one requirement for achieving Continuous Deployment?
When should centralized decision-making be used?
What is a Product Owner (PO) anti-pattern in Iteration planning?
How are the program risks, that have been identified during PI Planning, categorized?
The work within one state of a team's Kanban board is being completed at varying times, sometimes running faster and sometimes slower than the next state. What could resolve this issue?
What is a good source of guidance when creating an improvement roadmap that improves the teams technical practices?
A team consistently receives defect reports from production even though each Story is thoroughly tested. What is the first step to solve this problem?
What are two benefits of applying cadence? (Choose two.)
Which statement is true about work in process (WIP)?
What are relationships within a highly collaborative team based on?
A Scrum Master is frustrated that her team finds no value during Iteration retrospectives, and the team has asked that she cancel all future ones. Which two specific anti-patterns are most likely present within the team’s retrospectives? (Choose two.)
What are two purposes of the scrum of scrums meeting? (Choose two.)
What is the primary goal of decentralized decision-making?
How can a Scrum Master help the team remain focused on achieving their Iteration goals?
What are the benefits of organizing teams around Features?
If the distance between the arrival and departure curves on a team's cumulative flow diagram is growing apart, what is likely happening?
What is the purpose of the Large Solution Level in SAFe?
Why is the program predictability measure the primary Metric used during the quantitative measurement part of the Inspect and Adapt event?
Inspect and Adapt events occur at which two SAFe levels? (Choose Two)
Which two statements are true about a Feature? (Choose two.)
The Agile Team includes the Scrum Master and which other key role?
What are two actions the Scrum Master can take to help the team achieve the SAFe Core Value of transparency? (Choose two.)
Systems builders and Customers have a high level of responsibility and should take great care to ensure that any investment in new Solutions will deliver what benefit?
Which two Framework elements would a Scrum Master have the strongest connection and most frequent interaction? (Choose two.)
If a team insists that big Stories cannot be split into smaller ones, how would the Scrum Master coach them to do otherwise?
Why are Big Stories considered an anti-pattern?
CISA vs CISM: Which is better for a Cybersecurity Career?
Who is responsible for managing the Portfolio Kanban?
What is the goal of the House of Lean?
Social Media Marketing Strategies for Building Your Brand Presence Online
ITIL 4 Foundation Exam Tips and Study Guide
What is Site Reliability Engineering (SRE)?
How Toyota Entered the Luxury Car Market with Kaizen Principles
What are two ways to describe a cross-functional Agile Team? (Choose two.)
According to SAFe Principle #10, what should the Enterprise do when markets and customers demand change?
AWS Solution Architect Roles, Responsibilities and Salaries
Advantages of Attaining CISA Certification
Home
what-is-a-benefit-of-an-agile-release-train-that-has-both-cadence-and-synchronization

What is a benefit of an Agile Release Train that has both cadence and synchronization?

Picture of Bharath Kumar
Bharath Kumar
Bharath Kumar is a seasoned professional with 10 years' expertise in Quality Management, Project Management, and DevOps. He has a proven track record of driving excellence and efficiency through integrated strategies.

A. The Agile Release Train is able to control the injection on new work

B. Dependencies are identified across the Agile Release Train

C. The entire system is iterating

D. Teams participate in the portfolio backlog refinement

Correct Answer is

C. The entire system is iterating

Explanation

A benefit of an Agile Release Train (ART) that has both cadence and synchronization is that dependencies are identified across the Agile Release Train.

Here’s how each option relates to the benefits of cadence and synchronization in an ART:

  • The Agile Release Train is able to control the injection of new work: While controlling the injection of new work is important for managing flow and ensuring teams aren’t overloaded, it’s more of a function of effective backlog management and governance rather than a direct benefit of cadence and synchronization. Cadence and synchronization help manage the flow of work but in a broader sense of aligning teams and dependencies.

  • Dependencies are identified across the Agile Release Train: This is a key benefit of having both cadence (a fixed, predictable schedule for iterations) and synchronization (alignment across teams and increments). When teams operate on a common schedule and align their planning and delivery efforts, it becomes much easier to identify and manage dependencies among teams and components within the ART. This enables better coordination, reduces delays caused by unforeseen dependencies, and enhances overall efficiency and predictability.

  • The entire system is iterating: While it’s true that cadence and synchronization ensure that the entire system (or ART) operates in a coordinated and iterative manner, this is more of a characteristic or feature of the ART rather than a specific benefit like dependency management. It’s the mechanism that allows for benefits like dependency identification to occur.

  • Teams participate in the portfolio backlog refinement: Participation in portfolio backlog refinement is important for ensuring that teams are aligned with the larger organizational goals and are working on the most valuable and strategic initiatives. However, this participation is not a direct benefit of cadence and synchronization within an ART. Cadence and synchronization facilitate smoother execution and alignment within the ART, but portfolio backlog refinement involves broader strategic alignment that extends beyond the mechanics of cadence and synchronization.

Therefore, the identification and management of dependencies across teams and components are direct benefits of implementing both cadence and synchronization in an Agile Release Train, ensuring that the various parts of the ART work together smoothly and efficiently towards common objectives.

Other SAFe Scrum Master Question – An Agile Team decides they want to use pair programming in future Iterations. Where should this be captured?

Leave a Reply

Your email address will not be published. Required fields are marked *

Popular Courses

Follow us

2000

Likes

400

Followers

600

Followers

800

Followers

Subscribe us